Norwegian Star
Vigor performed an 11 day drydocking. Work included 8,000 pounds of steel work on the stern, Azipod, thrusters and fin stabilizer overhaul, blast and coat, life boat R/R, maintenance.
Significant renovations were done on the lido deck and aluminum bulkhead repairs and inserts were made on the pool deck and atrium level.