![](https://vigorindustrial.imgix.net/https%3A%2F%2Fvigor.net%2Fassets%2Fprojects%2Fnorwegian-star-01-aerial.jpg?fit=max&h=2400&q=95&w=2400&s=d8fa36e2769fbc65ac141950284404cd)
Norwegian Star
Vigor performed an 11 day drydocking. Work included 8,000 pounds of steel work on the stern, Azipod, thrusters and fin stabilizer overhaul, blast and coat, life boat R/R, maintenance.
Significant renovations were done on the lido deck and aluminum bulkhead repairs and inserts were made on the pool deck and atrium level.