Grand Princess

During 8 day drydocking, Vigor:

  • Made various steel repairs throughout the vessel
  • Removed 3 old AC chillers and installed new ones. A special loading platform was fabrication in advance to accomplish this along with side shell cuts for access. All 3 units were replaced and access sealed in 6 days.
  • A complete renewal of all propulsion shaft bearings.
  • Bow thruster replacement and overhauls
  • Regulatory inspection on all sea valves
  • Seal replacements on rudders and stabilizers
  • Lifeboat and tender davit repair and modifications.
  • Hull coating maintenance and painting of Livery logo on the bow.
  • Assisted Princess subcontractors who revitalized the pools and upgraded the Movie under the Stars screens and equipment.